Westminster Plumbing & Fuel Gas Code Amendments
City or town · Adams / Jefferson County · Colorado
- Plumbing code
- 2021 IPC
- Fuel gas code
- 2021 IFGC
- Effective
- Jun 1, 2024
- Adopted by
- Ord. No. 4241, Ord. No. 3908
- Local amendments
- 18
Westminster doesn't use the model plumbing and gas codes exactly as printed. It adopted the 2021 IPC and 2021 IFGC and then made 18 local changes. Some are paperwork, like permits and fees. Others change what you build in the field, including building sewer depth, gas pressure test, gas piping. If you bid off the model book alone, you can miss them. CodeCheck Colorado lists every one in plain English with the official source.
Topics covered
- Building sewer depth
- Gas pressure test
- Gas piping
- Venting
- Plumbing tests and inspections
- Fixtures
- Permits and administration
What is Westminster's building sewer depth requirement?
Westminster: building sewers at least 42 in. below grade, including at the septic tank (IPC 305.4.1).
1 more Westminster rule on this topic in the app. Sign in or start a free trial.
What is Westminster's gas pressure test requirement?
Sign in to see Westminster's rule
What does Westminster change about gas piping?
Sign in to see Westminster's rule
What are Westminster's local venting rules?
Sign in to see Westminster's rule
How does Westminster handle plumbing tests and inspections?
Sign in to see Westminster's rule
Does Westminster change any fixture requirements?
Sign in to see Westminster's rule
What permit and fee rules does Westminster add?
Sign in to see Westminster's rule