Template preview. This is the page a customer sees when a tech taps "Share with customer." Names and phone number are examples. How sharing works

UnverifiedLouisville’s building department has not confirmed this yet. Based on the city code as researched Sep 28, 2026.

Louisville, Colorado · Plumbing

Why this is required in Louisville

Your plumber shared this so you can see the local rule behind their recommendation.

36in
MINIMUM
Minimum depthof the building sewer below finished grade, including at a septic tank connection.
GRADE 36″ BUILDING SEWER

Depth of the building sewer below finished grade.

In plain English

The sewer line that carries wastewater out of a building must be buried at least 36 inches (3 feet) below the finished ground level.

This applies to every building sewer in Louisville, including where it connects to a septic tank. Burying the line deeper helps protect it from freezing and damage.

Louisville rule vs. standard code

Louisville
36in
Minimum, set by Ord. 1907-2025
Standard code
Set by each city
2024 IPC 305.4.1 leaves the number blank

Official source

305.4.1 Sewer depth. Building sewers that connect to private sewage disposal systems shall be a minimum of 36 inches below finished grade at the point of septic tank connection. Building sewers shall be a minimum of 36 inches below grade.
Louisville Municipal Code § 15.16.080
Ord. No. 1907-2025, § 7, adopted Nov 3, 2025
View official code on Municode(opens in a new tab)

Questions? Ask your plumber

MT
Shared by
Mike TorresEXAMPLEExample Plumbing Co.
Call Mike · (303) 555-0142
Shared
Sep 30, 2026
Status
Unverified
CodeCheck ColoradoPLACEHOLDER NAME

For information only, not legal advice. This is not an official City of Louisville or State of Colorado document. The official code text controls; confirm requirements with Louisville Building Safety. Tech and company names shown are examples.

Louisville, Colorado · Plumbing

Why this is required in Louisville

Your plumber shared this so you can see the local rule behind their recommendation.

36in
MINIMUM
Minimum depthof the building sewer below finished grade, including at a septic tank connection.
GRADE 36″ BUILDING SEWER

Depth of the building sewer below finished grade.

In plain English

The sewer line that carries wastewater out of a building must be buried at least 36 inches (3 feet) below the finished ground level.

This applies to every building sewer in Louisville, including where it connects to a septic tank. Burying the line deeper helps protect it from freezing and damage.

Louisville rule vs. standard code

Louisville
36in
Minimum, set by Ord. 1907-2025
Standard code
Set by each city
2024 IPC 305.4.1 leaves the number blank

Official source

305.4.1 Sewer depth. Building sewers that connect to private sewage disposal systems shall be a minimum of 36 inches below finished grade at the point of septic tank connection. Building sewers shall be a minimum of 36 inches below grade.
Louisville Municipal Code § 15.16.080
Ord. No. 1907-2025, § 7, adopted Nov 3, 2025
View official code on Municode(opens in a new tab)