Thornton Plumbing & Fuel Gas Code Amendments
City or town · Adams / Weld County · Colorado
- Plumbing code
- 2024 IPC
- Fuel gas code
- 2024 IFGC
- Effective
- Jul 1, 2025
- Adopted by
- Ord. No. 3731
- Local amendments
- 11
Thornton doesn't use the model plumbing and gas codes exactly as printed. It adopted the 2024 IPC and 2024 IFGC and then made 11 local changes. Some are paperwork, like permits and fees. Others change what you build in the field, including building sewer depth, water service line depth, gas pressure test. If you bid off the model book alone, you can miss them. CodeCheck Colorado lists every one in plain English with the official source.
Topics covered
- Building sewer depth
- Water service line depth
- Gas pressure test
- Gas piping
- Plumbing tests and inspections
- Fixtures
- Permits and administration
What is Thornton's building sewer depth requirement?
Thornton: building sewers at least 12 in. below grade, including at the septic tank (IPC 305.4.1).
1 more Thornton rule on this topic in the app. Sign in or start a free trial.
How deep does a water service line have to be in Thornton?
Sign in to see Thornton's rule
What is Thornton's gas pressure test requirement?
Sign in to see Thornton's rule
What does Thornton change about gas piping?
Sign in to see Thornton's rule
How does Thornton handle plumbing tests and inspections?
Sign in to see Thornton's rule
Does Thornton change any fixture requirements?
Sign in to see Thornton's rule
What permit and fee rules does Thornton add?
Sign in to see Thornton's rule