Milliken Plumbing & Fuel Gas Code Amendments

City or town · Weld County · Colorado

Plumbing code
2024 IPC
Fuel gas code
2024 IFGC
Effective
Jan 1, 2026
Adopted by
Ordinance No. 2025-834
Local amendments
15

Milliken doesn't use the model plumbing and gas codes exactly as printed. It adopted the 2024 IPC and 2024 IFGC and then made 15 local changes. Some are paperwork, like permits and fees. Others change what you build in the field, including building sewer depth, gas pressure test, gas piping. If you bid off the model book alone, you can miss them. CodeCheck Colorado lists every one in plain English with the official source.

Topics covered

What is Milliken's building sewer depth requirement?

2 local changes on this topic · Free sample

Milliken: sets how deep the building sewer must be buried (12 in). The model code leaves this number for each jurisdiction to fill in (IPC 305.4.1).

1 more Milliken rule on this topic in the app. Sign in or start a free trial.

What is Milliken's gas pressure test requirement?

2 local changes on this topic

Sign in to see Milliken's rule

Milliken sets its own rule for gas pressure test. Sign in to see the rule and ordinance.

What does Milliken change about gas piping?

3 local changes on this topic

Sign in to see Milliken's rule

Milliken sets its own rule for gas piping. Sign in to see the rule and ordinance.

What are Milliken's local venting rules?

2 local changes on this topic

Sign in to see Milliken's rule

Milliken sets its own rule for venting. Sign in to see the rule and ordinance.

How does Milliken handle plumbing tests and inspections?

2 local changes on this topic

Sign in to see Milliken's rule

Milliken sets its own rule for plumbing tests and inspections. Sign in to see the rule and ordinance.

What permit and fee rules does Milliken add?

3 local changes on this topic

Sign in to see Milliken's rule

Milliken sets its own rule for permits and administration. Sign in to see the rule and ordinance.