Milliken Plumbing & Fuel Gas Code Amendments
City or town · Weld County · Colorado
- Plumbing code
- 2024 IPC
- Fuel gas code
- 2024 IFGC
- Effective
- Jan 1, 2026
- Adopted by
- Ordinance No. 2025-834
- Local amendments
- 15
Milliken doesn't use the model plumbing and gas codes exactly as printed. It adopted the 2024 IPC and 2024 IFGC and then made 15 local changes. Some are paperwork, like permits and fees. Others change what you build in the field, including building sewer depth, gas pressure test, gas piping. If you bid off the model book alone, you can miss them. CodeCheck Colorado lists every one in plain English with the official source.
Topics covered
- Building sewer depth
- Gas pressure test
- Gas piping
- Venting
- Plumbing tests and inspections
- Permits and administration
What is Milliken's building sewer depth requirement?
Milliken: sets how deep the building sewer must be buried (12 in). The model code leaves this number for each jurisdiction to fill in (IPC 305.4.1).
1 more Milliken rule on this topic in the app. Sign in or start a free trial.
What is Milliken's gas pressure test requirement?
Sign in to see Milliken's rule
What does Milliken change about gas piping?
Sign in to see Milliken's rule
What are Milliken's local venting rules?
Sign in to see Milliken's rule
How does Milliken handle plumbing tests and inspections?
Sign in to see Milliken's rule
What permit and fee rules does Milliken add?
Sign in to see Milliken's rule